4.Installation
4.3Before Commissioning the Instrument
1
1
Fig. 13
2
7 (AN)
4
5
3
6
Fig. 14
Once the instrument is in its final location, unscrew the transport handles (1) from the instrument us- ing the size 6 Allen key provided and store them, along with the screws, in a safe place.
1.Set the power switch (7) on the right side of the instrument to OFF (❍).
2.Make sure that the power cable connection in the power socket (2) on the right side of the instrument is correct.
3.Connect the control panel to the socket (3).
4.Install the ice bath (4).
5.Install the buffer tray (5).
6.Install any optional accessories, such as the magnifier, microscope, foot switch, etc. ac- cording to p. 49.
7.Use the power switch (7) to switch on the in- strument.
To make it easier to insert the speci- men, adjust the specimen receptacle to its lowest position, and adjust the blade holder to its rearmost position during the first reference run.
Leica VT1200 and VT1200S – Microtome | 17 |