Liebert 3000 installation manual Expansion Tank Field Installed at

Models: 3000

1 76
Download 76 pages 48.63 Kb
Page 43
Image 43
Expansion Tank Field Installed at

Glycol/GLYCOOL Cooled Models

Figure 17 Glycol general arrangement

Expansion Tank Field Installed at

Drycooler

 

 

Glycol

Highest Point in System.

 

 

Electric

 

Unions*

Pump

Fill *

 

Pump

Box

Drycooler

 

 

 

 

Housing

 

 

Coil

 

 

 

 

 

Expansion

 

Fluid

Isolation

Evaporator

Port*

 

Return

Coil

 

Valves*

 

 

to Pump

 

 

 

 

 

Air Vents*

at Top of

Risers

 

Unions*

Fluid

Expansion

 

 

 

Supply

Valve

 

 

 

from

 

 

Hose

 

Pump

 

Sensing

Bibs*

Flow Regulating

 

Bulb

 

Valve*

Sight

 

 

 

Glass

 

 

 

Pressure

Hot Gas

External

 

Port*

 

 

 

Bypass

Equalizers

 

 

 

 

 

Filter

Valve

Scroll

 

 

Drier

 

Compressor

 

 

 

 

 

 

Hot Gas

Service

 

 

 

Bypass

Valves

 

 

 

Solenoid

 

 

 

 

Valve

 

 

Hot Gas Bypass

 

 

Tube

 

Bypass

in Tube

Fluid

Condenser

Valve

 

Supply

 

 

 

to Unit

 

 

Fluid

Return

from

Unit Isolation Valves*

2-Way Water

 

Regulating

3-Way Water

Valve

Regulating Valve

 

(optional)

Tube

in Tube

Condenser

Hose

Bibs*

Hose

Bibs*

 

 

 

 

 

 

 

 

 

 

 

 

 

Fluid

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Supply

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to Unit

Fluid

 

 

 

 

 

 

 

 

 

 

 

 

 

FACTORY

Return

 

 

 

 

 

 

 

 

 

 

 

 

 

From

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIPING

Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

FIELD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIPING

 

*Components are not supplied by Liebert but

 

are recommended for proper circuit operation

 

and maintenance.

 

SL-11898 PG 6

37

Page 43
Image 43
Liebert 3000 installation manual Expansion Tank Field Installed at