Liebert 3000 installation manual GLYCOOL general arrangement, Glycol/GLYCOOL Cooled Models

Models: 3000

1 76
Download 76 pages 48.63 Kb
Page 44
Image 44
Figure 18 GLYCOOL general arrangement

Glycol/GLYCOOL Cooled Models

Figure 18 GLYCOOL general arrangement

 

Expansion Tank Field Installed at

 

 

 

Highest Point in System

 

 

Unions*

 

Fill *

Drycooler

Drycooler

 

 

 

 

 

 

Electric

 

 

 

 

Box

Coil

 

 

 

 

 

 

 

 

 

 

Fluid

 

 

 

Pressure

 

Return to

Isolation

 

Port*

Unions*

Pump

 

Valves*

 

 

Fluid

 

 

 

 

 

 

 

 

 

 

Supply

 

 

 

Hose

 

from

 

 

Air Vents*

 

Pump

 

 

Bib*

 

 

 

 

at Top of

Flow Regulating

Sight

 

 

 

Risers

 

Valve*

 

Glass

 

 

 

Pressure

 

 

 

Port*

Filter

Drier

Hot Gas

Bypass

Solenoid

Valve

Hot Gas

Bypass

3-Way Water

Regulating

FluidValve

Valve

Supply to

Glycol

Pump

Pump

Housing

Evaporator

Coil

Expansion

Valve

Sensing

Bulb

Hot Gas

Bypass External

Valve Scroll Equalizers

Compressor

Service

Valves

Econ-O-Coil

Tube

in Tube

Condenser

Unit

Actuator

Fluid

Econ-O-Cycle

 

Return

 

Comparator

 

from

 

Unit

Isolation

3-Way Chilled

 

 

Valves*

Glycol Valve

Econ-O-Coil

Circuit

Hose Bibs*

FACTORY PIPING

 

FIELD PIPING

 

*Components are not supplied by Liebert but

SL-11901 PG 5

are recommended for proper circuit operation and maintenance.

38

Page 44
Image 44
Liebert 3000 installation manual GLYCOOL general arrangement, Glycol/GLYCOOL Cooled Models