CoolTherm

Manual / Bedienungsanleitung

9.2Checklist for unit installation

Checked performed

Completed

Comments

 

(After completion confirm

 

 

with signature)

 

Check unit for damage on delivery

 

 

 

 

 

Check for level floor

 

 

 

 

 

Check max. floor load

 

 

 

 

 

CoolTherm feet adjusted

 

 

CoolTherm is level

 

 

 

 

 

Automatic door opening adjusted

 

 

 

 

 

No remains of packaging in the

 

 

CoolTherm

 

 

 

 

 

All installation tools removed

 

 

 

 

 

Cable entries into the

 

 

unit correct and air-tight

 

 

 

 

 

Cable connections checked

 

 

 

 

 

Chilled water connection does not leak

 

 

Pressure test performed

 

 

 

 

 

Chilled water network bled

 

 

 

 

 

Chilled water flow rate adjusted

 

 

 

 

 

Condensed water pipe clear

 

 

 

 

 

Chilled water system odour trap in order

 

 

 

 

 

Heat exchanger tray connected to

 

 

condensed water pipe

 

 

 

 

 

Fan function checked

 

 

 

 

 

All front panels closed

 

 

(separation of air flows)

 

 

 

 

 

.............................................

........................................

....................

Place:

Date:

Signature

 

 

Checker

CoolTherm

01_998_330_0_k

page / Seite 34/83

Page 36
Image 36
Liebert XDK-W user manual Checklist for unit installation, Checked performed Completed Comments