Piping
2.6Checklist for Proper Installation
___ 1. Unpack and check received material.
___ 2. Position the Liebert XDP and secure it to the floor.
___ 3. Wire high voltage connections.
___ 4. Wire low voltage connections.
___ 5. Connect the building chilled water piping to the Liebert XDP.
___ 6. Connect the Liebert XD cooling module piping to the Liebert XDP.
___ 7. Check the system for leaks.
___ 8. Hold a vacuum on the system.
___ 9. Charge the system with refrigerant.
___ 10. Make sure that all piping has proper insulation.