Figure 77. Installing the Rack PDU on the vertical mounting plate

3.If you have a second M/PDU devi e to install, install it on the vertical mounting plate with four M3x5 screws that come with the second device.

Figure 78. Installing a second Rack PDU

4.Install the vertical mounting plate c2din the side of your rack cabinet with four M6 screws and nuts that come with this option. Make sure that the four- connector side of the Rack PDU is facing the rear of your rack cabinet, and leave

room between the vertical mounting plate and the rear EIA mounting flanges for the cable-management bracket c1d.

168Hardware Maintenance Manual: IBM PC Server/Enterprise Racks

Page 176
Image 176
IBM 42X, 9TX, 9TS, 9QX, 9QS, 900, 4SB, 4SA, 42P, 200, 42E, 42S, 4QS, 4QX manual Installing the Rack PDU on the vertical mounting plate