Note: Removing the rack doors and side panels might make your console switch installation easier.

2.If the monitor shelf is not already installed, install the monitor shelf according to its documentation.

3.Place the console switch in the rear compartment of the monitor shelf; then, install and tighten the four M3x5 screws.

Notes:

a.Make sure that the rear of the console switch is facing the back of your rack cabinet.

b.If you install a 2x8 Console Switch inside the monitor shelf, you will not be able to use the B port on the console switch to connect a second monitor, keyboard, and mouse.

Monitor shelf

Console switch

Rear compartment

Continue with the rest of the procedure to cable your console switch.

Note: Refer to the Apex User Guide CD for additional information if you are configuring a tiered installation.

4.Verify that the power switch on the rear of the console switch is in the Off position before connecting any cables.

5.Route your mouse cable neatly toward the rear of the console switch; then, connect it to the appropriate mouse connector on Port A of the console switch.

IBM NetBAY console switch 133

Page 141
Image 141
IBM 9TS, 9TX, 9QX, 9QS, 900, 4SB, 4SA, 42P, 42X, 200, 42E, 42S, 4QS, 4QX manual Monitor shelf Console switch Rear compartment