Note: The mounting holes on the upper and lower side bra es in a rack side compartment must be between 48.6 cm (19.1 in.) and 56.9 cm (22.4 in.) apart. If your rack cabinet has movable side braces, refer to your rack documentation for information about relocating your side braces if they are not already spaced for this installation.

1.Refer to the documentation that comes with your rack cabinet for additional information.

Note: Removing the rack doors and side panels might make your Rack PDU installation easier.

2.Verify that the circuit breaker switch is in the Off position before installing your Rack PDU.

3.Install the Rack PDU c3dto the vertical mounting plate c2dwith four M3x5 screws c1dthat come with this option. Make sure that the countersink holes in the vertical mounting plate are facing away from the device.

Note: Align the Rack PDU to one end or the other of the vertical mounting plate to leave room for a second device.

Figure 58. Installing the Rack PDU on the vertical mounting plate

4.If you have a second M/PDU devi e to install, install it on the vertical mounting plate with four M3x5 screws that come with the second device.

Figure 59. Installing a second Rack PDU

5.Install the vertical mounting plate c2din the side of your rack cabinet with four M6 screws and nuts that come with this option. Make sure that the seven- connector side of the Rack PDU is facing the rear of your rack cabinet, and leave room between the vertical mounting plate and the rear EIA mounting flanges for the cable-management bracket c1d.

NetBAY Power Distribution Units 143

Page 151
Image 151
IBM 42S, 9TX, 9TS, 9QX, 9QS, 900, 4SB, 4SA, 42P, 42X, 200, 42E, 4QS, 4QX manual Installing the Rack PDU on the vertical mounting plate