Figure 74. Installing the vertical mounting plate and cable-management bracket

5.Install the cable-management bracket 1 beside the vertical mounting plate with four M6 screws and nuts that come with this option.

6.Route the fixed line cords down, towards the rack side braces; then, route the line cords along the side brace towards the back of the rack cabinet and secure them with the cable straps that come with this option.

MAIN

MAIN

3

2

1

3

2

1

Figure 75. Routing the fixed line cords

NetBAY Power Distribution Units 163