Trim piece

Threaded standoff

Bolt and washer

Figure 42. Attaching two adjacent rack cabinets to each other to form a suite

1.Remove both side panels (see “Removing and installing the side panels” on page 85) from the side of a primary rack cabinet that is adjacent to an expansion rack in a suite.

2.Remove the front and rear doors (see “Doors” on page 87) from all rack cabinets.

3.On the outside of two adjacent rack cabinets, install the four threaded standoffs that come with the expansion rack cabinet:

a.Install two threaded standoffs on the rack cabinet to the left, one on the top- front and one on the bottom-rear.

b.Install the other two threaded standoffs on the rack cabinet to the right, one on the bottom-front and one on the top-rear.

4.Attach the rack cabinets together, using four bolts and washers that come with the expansion rack cabinet.

Note: You must install the top-front and bottom-rear bolts from right-to-left; then, install the bottom-front and top-rear bolts from left-to-right.

NetBAY 42 Enterprise Rack (Type 9308 Models 42P, 42X, 4SA, 4SB, 42S, 42E) 93

Page 101
Image 101
IBM 9QS, 9TX, 9TS, 9QX, 900, 4SB, 4SA, 42P, 42X, 200, 42E, 42S, 4QS, 4QX manual Trim piece Threaded standoff Bolt and washer