Lochinvar 51-211 Prepare boiler continued, Mounting the boiler, 3 Installing Propane Orifice

Models: 51-211

1 80
Download 80 pages 15.82 Kb
Page 13
Image 13
2 Prepare boiler (continued)
￿ WARNING

2 Prepare boiler (continued)

13.Reattach the wiring connector to the gas valve. Tighten the screw on the wiring connector to secure to the gas valve.

14.Turn the gas valve power switch to the “ON” position.

15.Reattach the bezel to the unit. Reconnect the ribbon cable to the control board.

16.After installation is complete, fill out the gas conversion label (in the conversion kit bag) and affix it to the unit under the boiler rating plate inside the unit. Attach the LP caution label (in the conversion kit bag) to the left side of the unit in the lower left corner.

17.Replace the front access cover.

￿ WARNING

After converting to LP, check combustion

per the Start-up procedure in Section 10

 

of this manual. Failure to check and

 

verify combustion could result in severe

 

personal injury, death, or substantial

 

property damage.

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 2-3Installing Propane Orifice

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mounting the boiler

See page 9 of this manual for boiler mounting location instructions.

NOTICE

The Knight Wall Mount boiler is not

intended for floor installation.

 

Mounting to a wood studded wall:

1.The wall mount bracket is designed for a stud spacing of 16 inches from center. For other stud spacing a solid mounting surface must be provided by the installer.

￿WARNING Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the studs

only.

2.Mount the wall bracket using the 2 1/4" lag bolts provided. Make sure the top edge of the bracket is away from the wall. Ensure the bracket is level when mounted. Extreme care is needed to ensure the bolts are secured in the center of the studs.

3.Hang the boiler on the bracket and secure the bottom of the boiler with two (2) additional lag bolts provided.

Installation & Operation Manual

￿WARNING The boiler is too heavy for a single person to lift. A minimum of two people is needed

for mounting the boiler onto the bracket.

Mounting to a concrete wall:

1.Mount the wall bracket using the two (2) wedge anchor bolts provided with the bracket. To mount the wedge anchor bolts, drill a 1/4" diameter hole 1 1/8" deep and insert anchor. Hang the bracket from the anchor and secure with the two nuts provided. Make sure the top edge of the bracket is away from the wall. Ensure bracket is level when mounted. Extreme care is needed to ensure the bolts are secured in the center of the studs.

Note: If wall thickness does not allow a 1 1/8" deep hole, field supplied hardware suitable for the application should be provided.

2.Hang the boiler on the bracket and secure the bottom of the boiler with two (2) remaining anchors, following the

instructions above.

The boiler is too heavy for a single person to lift. A minimum of two people is needed for mounting the boiler onto the bracket.

Mounting to a metal studded wall:

1.The wall mount bracket is designed for a stud spacing of 16 inches from center. For other stud spacing a solid mounting surface must be provided by the installer.

￿WARNING Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the studs only.

2.Mount the wall bracket using two (2) field supplied toggle bolts capable of supporting 100 pounds each. Ensure the top edge of the bracket is away from the wall. Ensure the bracket is level when mounted. Extreme care is needed to ensure the bolts are secured in the center of the studs.

3.Hang the boiler on the bracket and secure the bottom of the boiler with two (2) field supplied toggle bolts.

￿WARNING The boiler is too heavy for a single person to lift. A minimum of two people is needed

for mounting the boiler onto the bracket.

Figure 2-4Mounting the Boiler

WALL:

WOOD OR METAL STUDS ON 16" CENTERS

-OR-

MASONRY / POURED CONCRETE

MOUNTING BRACKET (FACTORY SUPPLIED)

FASTENERS

APPROPRIATE

FOR WALL TYPE

QTY: 4

Figure 2-3Installing Propane Orifice 13 Mounting the boiler

Page 13
Image 13
Lochinvar 51-211 Prepare boiler continued, Mounting the boiler, 3 Installing Propane Orifice, Mounting to a concrete wall