Lochinvar 51-211 Sidewall direct venting, Vent/air termination - sidewall, Determine location

Models: 51-211

1 80
Download 80 pages 15.82 Kb
Page 22
Image 22
4 Sidewall direct venting

Installation & Operation Manual

4 Sidewall direct venting

Vent/air termination – sidewall

Figure 4-1APVC/CPVC/Polypropylene Sidewall

￿WARNING

￿WARNING

Follow instructions below when determining vent location to avoid possibility of severe personal injury, death, or substantial property damage.

A gas vent extending through an exterior wall shall not terminate adjacent to a wall or below building extensions such as eaves, parapets, balconies, or decks. Failure to comply could result in severe personal injury, death, or substantial property damage.

Termination of Air and Vent

TO BOILER

INTAKE AIR

CONNECTION

FROM BOILER

VENT PIPE

CONNECTION

12"

POSSIBLE ORIENTATIONS

MIN

TO

OVER-

HANG

VENT / AIR

TERMINATION

Determine location

Locate the vent/air terminations using the following guidelines:

1.The total length of piping for vent or air must not exceed the limits given in the General Venting Section on page 16 of this manual.

2.You must consider the surroundings when terminating the vent and air:

a.Position the vent termination where vapors will not damage nearby shrubs, plants or air conditioning equipment or be objectionable.

b.The flue products will form a noticeable plume as they condense in cold air. Avoid areas where the plume could obstruct window views.

c.Prevailing winds could cause freezing of condensate and water/ice buildup where flue products impinge on building surfaces or plants.

d.Avoid possibility of accidental contact of flue products with people or pets.

e.Do not locate the terminations where wind eddies could affect performance or cause recirculation, such as inside building corners, near adjacent buildings or surfaces, window wells, stairwells, alcoves, courtyards, or other recessed areas.

￿WARNING Sidewall vent and air inlet terminations must terminate in the same pressure zone.

f.Do not terminate above any door or window. Condensate can freeze, causing ice formations.

g.Locate or guard vent to prevent condensate damage to exterior finishes.

Vent/air termination – sidewall 22 Figure 4-1APVC/CPVC/Polypropylene Sidewall

12"

MIN

 

 

GRADE OR

 

 

SNOW LINE

Table 4A Sidewall Vent Kit

 

ModelKit Number
Vent Size

51 - 106

KIT30044
2 inch vent

151 - 211

KIT30045
3 inch vent
If using the alternate sidewall termination:

3.The air piping must terminate in a down-turned elbow as shown in FIG. 4-1B. This arrangement avoids recirculation of flue products into the combustion air stream.

4.The vent piping must terminate in an elbow pointed outward or away from the air inlet, as shown in FIG. 4-1B.

￿WARNING Do not exceed the maximum lengths of the outside vent piping shown in FIG. 4-1B.

Excessive length exposed to the outside could cause freezing of condensate in the vent pipe, resulting in potential boiler shutdown.

Figure 4-1BAlternate PVC/CPVC/ Polypropylene Sidewall Termination of Air and Vent w/Field Supplied Fittings

TO BOILER

INTAKE AIR Termination of Air and VentDetermine location BIRD SCREEN

CONNECTION

FROM BOILER

12” MIN

VENT PIPE

15” MAX

CONNECTION

 

TERMINATION

PLATE

12”

Table 4A Sidewall Vent KitModel MIN BIRD SCREEN

GRADE OR

SNOW LINE

Page 22
Image 22
Lochinvar 51-211 Sidewall direct venting, Vent/air termination - sidewall, Determine location, Vent Size, KIT30044, Model