
Installation & Operation Manual
3 General venting (continued)
PVC/CPVC
| This product has been approved for use with the PVC/CPVC | Examples: 1. Seven (7) feet vertical | 
 | |||||||||||||||
| vent materials listed in Table 3D. | 
 | 
 | 
 | 
 | 
 | 2. Connector + 90° elbow + 2 feet horizontal | |||||||||||
| Installing vent and air piping | 
 | 
 | 
 | 
 | 
 | 3. One (1) foot | vertical + | 90° elbow + 1 foot | |||||||||
| 
 | 
 | 
 | 
 | 
 | horizontal | 
 | 
 | 
 | 
 | ||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | ||||
| 
 | WARNING | 
 | The vent connection to the appliance must | 
 | 1. | Work from the boiler to vent or air termination. Do not | |||||||||||
| 
 | 
 | 
 | be made with the starter piece provided | 
 | 
 | 
 | exceed the lengths given in this manual for the air or vent | ||||||||||
| 
 | 
 | 
 | with the appliance if PVC/CPVC vent is to | 
 | 
 | 
 | |||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | piping. | 
 | 
 | 
 | 
 | |||||||
| 
 | 
 | 
 | be used. The field provided vent fittings | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |||||||
| 
 | 
 | 
 | 
 | 2. | Cut pipe to the required lengths and deburr the inside | ||||||||||||
| 
 | 
 | 
 | must be cemented to the CPVC pipe section | 
 | 
 | 
 | and outside of the pipe ends. | 
 | |||||||||
| 
 | 
 | 
 | using an “All Purpose Cement” suitable for | 
 | 3. Chamfer outside of each pipe end to ensure even | ||||||||||||
| 
 | 
 | 
 | PVC and CPVC pipe. Use only the vent | 
 | |||||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | cement distribution when joining. | |||||||||||
| 
 | 
 | 
 | materials, primer, and cement specified in | 
 | 
 | 
 | |||||||||||
| 
 | 
 | 
 | 
 | 4. Clean all pipe ends and fittings using a clean dry rag. | |||||||||||||
| 
 | 
 | 
 | Table 3D to make the vent connections. | 
 | |||||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | (Moisturewillretardcuringanddirtorgreasewillprevent | |||||||||||
| 
 | 
 | 
 | Failure to follow this warning could result | 
 | 
 | 
 | |||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | adhesion.) | 
 | 
 | 
 | 
 | |||||||
| 
 | 
 | 
 | in fire, personal injury, or death. | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |||||||
| 
 | 
 | 
 | 
 | 5. | Dry fit vent or air piping to ensure proper fit up before | ||||||||||||
| 
 | 
 | 
 | Use only cleaners, primers, and solvents | 
 | |||||||||||||
| 
 | NOTICE | 
 | 
 | 
 | 
 | assembling any joint. The pipe should go a third to | |||||||||||
| 
 | 
 | that are approved for the materials which | 
 | 
 | 
 | ||||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | ||||||||||||
| 
 | 
 | 
 | are joined together. | 
 | 
 | 
 | 
 | ||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | cement is applied. | 
 | 
 | 
 | 
 | ||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |||||
| 
 | 
 | 
 | All PVC vent pipes must be glued, properly | 
 | 6. | Priming and Cementing: | 
 | ||||||||||
| 
 | NOTICE | 
 | 
 | ||||||||||||||
| 
 | 
 | supported, and the exhaust must be | 
 | 
 | 
 | a. Handle fittings | and pipes | carefully to prevent | |||||||||
| 
 | 
 | 
 | pitched a minimum of a 1/4 inch per foot | 
 | 
 | 
 | 
 | contamination of surfaces. | 
 | ||||||||
| 
 | 
 | 
 | back to the boiler (to allow drainage of | 
 | 
 | 
 | b. Apply a liberal even coat of primer to the fitting | ||||||||||
| 
 | 
 | 
 | condensate). | 
 | 
 | 
 | 
 | 
 | socket and to the pipe end to approximately 1/2" | ||||||||
| 
 | 
 | 
 | Insulation should not be | used on PVC | 
 | 
 | 
 | 
 | beyond the socket depth. | 
 | |||||||
| 
 | WARNING | 
 | 
 | 
 | 
 | 
 | 
 | ||||||||||
| 
 | 
 | 
 | 
 | 
 | c. | Apply a second primer coat to the fitting socket. | |||||||||||
| 
 | 
 | 
 | or CPVC venting materials. The use of | 
 | 
 | 
 | d. While primer is still wet, apply an even coat of | ||||||||||
| 
 | 
 | 
 | insulation will cause increased vent wall | 
 | 
 | 
 | |||||||||||
| 
 | 
 | 
 | temperatures, which could result in vent | 
 | 
 | 
 | 
 | approved cement to the pipe equal to the depth of | |||||||||
| 
 | 
 | 
 | pipe failure. | 
 | 
 | 
 | 
 | 
 | the fitting socket along with an even coat of | ||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | approved cement to the fitting socket. | |||||||
| 
 | Table 3D PVC/CPVC Vent Pipe, and Fittings | 
 | 
 | 
 | e. | Apply a second coat of cement to the pipe. | |||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | f. | While the cement is still wet, insert the pipe into | |||||||
| 
 | Approved PVC/CPVC Vent Pipe and Fittings | 
 | 
 | ||||||||||||||
| 
 | 
 | 
 | 
 | the fitting, if possible twist the pipe a 1/4 turn as | |||||||||||||
| 
 | Item | 
 | Material | 
 | Standard | 
 | 
 | 
 | 
 | you insert it. | NOTE: | If voids are present, | |||||
| 
 | 
 | 
 | PVC Schedule 40, 80 | 
 | ANSI/ASTM D1785 | 
 | 
 | 
 | sufficient cement was not applied and joint could | ||||||||
| 
 | Vent pipe | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | be defective. | 
 | 
 | 
 | 
 | |||
| 
 | 
 | PVC - DWV | 
 | ANSI/ASTM D2665 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | ||||||
| 
 | 
 | 
 | 
 | 
 | g. Wipe excess cement from the joint removing ring or | ||||||||||||
| 
 | 
 | 
 | CPVC Schedule 40, 80 | 
 | ANSI/ASTM F441 | 
 | 
 | ||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | beads as it will needlessly soften the pipe. | ||||||||||
| 
 | 
 | 
 | PVC Schedule 40 | 
 | ANSI/ASTM D2466 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |
| 
 | Vent fittings | 
 | 
 | Figure  | |||||||||||||
| 
 | PVC Schedule 80 | 
 | ANSI/ASTM D2467 | 
 | |||||||||||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |||||
| 
 | 
 | 
 | CPVC Schedule 80 | 
 | ANSI/ASTM F439 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |||
| 
 | Pipe Cement / | 
 | PVC | 
 | ANSI/ASTM D2564 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |
| 
 | Primer | 
 | CPVC | 
 | ANSI/ASTM F493 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | CPVC STARTER PIECE | ||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | ||||||
| 
 | NOTICE: DO NOT USE CELLULAR (FOAM) CORE PIPE | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | |||||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | ||||||
NOTE: In Canada, CPVC and PVC vent pipe, fittings and cement/ primer must be 
WARNING For models 51 - 106 when transitioning from 2 to 3 inch vent diameter, a 2" pipe section and
2"to 3" increaser are required to be CPVC when PVC/CPVC vent is used.
For installations using 2" vent, the first seven
(7) equivalent feet of vent must be CPVC (field supplied). See examples on this page.
 19
 19 
