Lochinvar 51-211 8 Single Boiler Zoned with Valves, Hydronic piping continued, Make Up Water

Models: 51-211

1 80
Download 80 pages 15.82 Kb
Page 45
Image 45
Figure 6-8Single Boiler Zoned with Valves

Installation & Operation Manual

6 Hydronic piping (continued)

Figure 6-8Single Boiler Zoned with Valves

 

 

ZONE #1

 

 

PRESSURE

PRESSURE

 

 

 

REDUCING VALVE

GAUGE

ZONE #2

ZONE #3

ZONE #4

 

 

BACKFLOW

 

 

 

 

PREVENTER

 

 

 

 

MAKE UP WATER

 

 

 

 

SYSTEM SUPPLY

SYSTEM

 

 

 

SENSOR

 

 

 

 

CIRCULATOR

 

 

AIR SEPARATOR

 

 

 

 

 

EXPANSION

 

 

 

 

TANK

 

 

ZONE VALVES (TYPICAL)

DIFFERENTIAL PRESSURE BYPASS VALVE (IF USED)

BALL VALVE (TYPICAL)

DRAIN POINT

(TYPICAL)

MAY SUBSTITUTE LOW LOSS HEADER

MAKE UP WATER BOILER Manual backgroundManual background Y-STRAINER Manual backgroundManual background (RECOMMENDED)

 

 

 

DOMESTIC

HOT

 

 

 

 

 

 

WATER

 

 

ANTI-SCALD

 

 

 

 

FLOW CHECK

HOT WATER

OUT

 

 

MIXING VALVE

 

VALVE

CIRCULATOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COLD

WATER

IN

PRESSURE

RELIEF VALVE

BOILER

CIRCULATOR

Manual background BOILER Manual background

UNION

 

(TYPICAL)

DRAIN

 

TEMPERATURE /

 

PRESSURE

 

GAUGE

 

NOTICE

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

Manual background 45 Manual background

Page 45
Image 45
Lochinvar 51-211 8 Single Boiler Zoned with Valves, Hydronic piping continued, Installation & Operation Manual