Lochinvar 51-211 Multiple vent/air terminations, Sidewall direct venting continued

Models: 51-211

1 80
Download 80 pages 15.82 Kb
Page 25
Image 25
Multiple vent/air terminations

Installation & Operation Manual

4 Sidewall direct venting (continued)

Multiple vent/air terminations

1.When terminating multiple Knight wall mount boilers terminate each vent/air connection as described in this manual (FIG. 4-5A).

￿WARNING All vent pipes and air inlets must terminate at the same height to avoid possibility of

severe personal injury, death, or substantial property damage.

2.Place wall penetrations to obtain minimum clearance of 12 inches between edge of air inlet and adjacent vent outlet, as shown in FIG. 4-5A for U.S. installations. For Canadian installations, provide clearances required by CSA B149.1 Installation Code.

3.The air inlet of a Knight wall mount boiler is part of a direct vent connection. It is not classified as a forced air intake with regard to spacing from adjacent boiler vents.

Figure 4-5AMultiple Vent Terminations (must also comply with Figure 4-1A)

12" MIN. BETWEEN EDGE OF AIR Manual background INLET AND ADJACENT VENT OUTLET

VENT

Figure 4-5BAlternate Multiple Vent Terminations w/Field Supplied Fittings (must also comply with Figure 4-1B)

AIR

VENT / AIR

TERMINATION

Manual background 25 Manual background

Page 25
Image 25
Lochinvar 51-211 Multiple vent/air terminations, Sidewall direct venting continued, Installation & Operation Manual