Manitowoc Ice manual RFS0300 Operation, RFS0650/RF1200/RF2300 Operation, Section

Models: RF

1 54
Download 54 pages 30.34 Kb
Page 18
Image 18
RFS0300 Operation

Section 3

Operation

 

 

RFS0300 Operation

The ice machine will not start until:

A.The rocker switch is moved to “ON”.

B.Ice does not contact the bin thermostat bulb.

C.The water reservoir is full of water.

Placing the toggle switch in the ON position starts the gear motor and a 10 minute compressor time delay. The compressor starts and the float valve controls the water inlet valve and water level. The freeze cycle ends when ice contacts the bin thermostat. The ice machine remains off until ice no longer contacts the bin thermostat.

BIN THERMOSTAT RFS0650/RF1200/RF2300 OperationManual background

EVAPORATOR Manual background

THERMOSTAT

RFS0650/RF1200/RF2300 Operation

The ice machine will not start until:

A.The rocker switch is moved to “ON”.

B.Ice does not contact the bin thermostat bulb.

C.The water reservoir is full of water.

Placing the toggle switch in the ON position starts the gear motor. After the rotation speed sensor verifies

10 minutes of correct rotation, the time delay ends and the compressor starts. The ice machine will continue to make ice until ice contacts the bin thermostat. The ice machine remains off until ice no longer contacts the bin thermostat.

BIN THERMOSTAT IS

LOCATED ON SIDE OF

CONTROL BOX

Part Number 000007644 3/11

20

Page 18
Image 18
Manitowoc Ice manual RFS0300 Operation, RFS0650/RF1200/RF2300 Operation, Section