Testing Procedures
!WARNING
To avoid the risk of electric shock, personal injury or death, disconnect power before servicing, unless testing requires it.
Oven Light Relay—K10
Drive voltage at J1 connector Pins
1.Turn off power to oven.
2.Attach voltmeter lead to E3 (neutral) connector on relay module.
3.Attach voltmeter lead to E17 connector on relay module.
4.Turn on power and touch oven light pad.
5.If 120 VAC is indicated oven light relay is operating.
Display (Filament) Voltage
1.Turn power on, turn meter to VAC scale.
2.Touch meter lead to
3.Touch meter to
4.Meter should indicate 3.2 VADC.
Door Lock Relay—K3
Double line break relay okay. Drive voltage at J1 connector Pins
1.Turn off power to oven.
2.Attach voltmeter lead to E3 (neutral) connector on relay module.
3.Attach voltmeter lead to E8 connector on relay module.
4.Turn on power and program cleaning cycle operation.
5.Two indications will be present during this test.
a.120 VAC will be present when the lock assembly is being engaged.
b.0 VAC is indicated when the door is locked and cleaning cycle is operational.
©2003 Maytag Appliances Company | 16021875 Rev. 0 |