For installing and connecting a new electronic control

board, the service techni­ cian must beearthed with a grounding band.

R E P A I R S

Replacing button prints / coffee buttons

Assembly checkpoints

After assembly check the plug arrangement of the electronic control board (see “Wiring diagrams” on page 118 and following.

Lay connection wires to button prints in brackets and cable guide like shown.

108Citiz service manual

Page 108
Image 108
Nespresso EF485/486, EF483/484, EF487/488 manual P a I R S