R E P A I R S

Assembly checkpoints

Use marked cable guide to lay wires.

The mains switch holder (54) has a notch: correct fitting position is with mains switch connections next to the platform (see detail).

During assembly of the water tank connector (53) on the platform, each of its 3 latches has to engage with an audible click.

Citiz service manual

61

Page 61
Image 61
Nespresso EF483/484, EF485/486, EF487/488 manual Assembly checkpoints