F U N C T I O N T E S T S

9)Connect mains cable.

10)Switch on coffee machine.

9.4.2 Test run

11)After heating up, press the "small cup" button.

12)Open the valve and let the water flow for approximately 10 sec out of the drain hose.

13)Close the valve completely. The pres­ sure stabilizes after increasing briefly between 16­19 bar (pressure check).

The pressure increases slowly with increasing temperature. Should the pressure exceed 23 bar, switch off the coffee machine and release the pressure by opening the valve.

For better visibility use a flashlight.

14)Check all connections under pressure for audible and visible leaks.

Do not run the pump for more than 50 sec with the valve closed.

Citiz service manual

135

Page 135
Image 135
Nespresso EF485/486, EF483/484, EF487/488 manual Test run, 135