At the completion of the float test, the humidifier will begin the combustion sequence by energizing the combustion blowers
All blowers will run at full output for 30 seconds to
The igniter(s) will be energized for 15 seconds, allowing it time to heat to the appropriate ignition temperature and the gas valve will be energized
After 4 seconds both the gas valve(s) and the igniter will be
After three trials for ignition (complete with
NOTE: On multiple burner models, each burner tries to ignite in sequence. It is necessary to wait for all burners to cycle to complete the test.
Manually
To reset the humidifier, shut off the power switch, then turn the power back on
STARTING THE HUMIDIFIER
Once the tank has been filled and the ignition safety test has been performed as outlined above, the humidifier is ready to be put into operation.
Verify that the inspection checklist has been completed and all deficiencies with the installation have been corrected
Open the
Open the
Ensure all external controls connected to the security loop are closed
Verify that the building demand signal is connected to the humidifier
Install and secure all cabinet service doors
Switch the humidifier on
At the completion of the float test, the humidifier will begin the combustion sequence and each burner will ignite in sequence
Depending on the system demand the combustion blowers will modulate faster or slower to control the burner input
The water in the tank will heat up and begin to boil, delivering steam to the distribution system
During the boiling sequence the water fill valve will periodically activate to replenish water that has evaporated from the tank
Once the humidity requirements have been satisfied (demand drops below minimum %) all gas valves will be
The humidifier will go into standby mode until the next call for humidity (demand rises above minimum %) at which time the unit will again begin the combustion sequence
TAKING OUT OF OPERATION
If it is required that the humidifier be taken out of operation (e.g. for service or end of season
If the unit is firing, remove the demand signal or open the security loop, allowing the burners to shut off and the blowers to perform a post purge of the heat exchangers before shutting off
Switch the main power switch from On to Off and then to the Drain position. The drain pump will be energized and the tank will begin to drain
Once the tank has completely emptied shut off the drain switch
Close the
- 24 -