Nortec Industries GS Series manual Gs Inspection Check List, Humidifier Mounting, Gas Piping, Size

Models: GS Series

1 78
Download 78 pages 6.36 Kb
Page 29
Image 29

GS INSPECTION CHECK LIST

HUMIDIFIER MOUNTING

￿Verify proper clearances around the unit

￿Humidifier mounted level

￿Humidifier properly secured to stand and stand bolted to floor

￿All service doors accessible

￿Roof curb sized correctly (Outdoor Model Only)

GAS PIPING

￿Correct gas line size installed

￿Certified manual shut off valve and union installed

￿Sediment trap installed

￿Gas piping leak tested

￿Air purged from lines

￿Proper gas supply pressure

￿Regulator dedicated for each gas unit

EXHAUST GAS VENTING

￿Comply with local regulations

￿Proper venting materials used (B or BH) – refer to gas codes

￿Maximum vent length of 100 feet (70 feet for direct vent models)

￿Proper pipe diameter used

￿Condensate tee installed

STEAM LINES

￿Slope up 2” per 12”

￿Sloped back to drain

￿Slope down ½” per 12”

￿Trapped 2” more than static duct pressure

￿ Traps

Size _______

￿Insulated

￿Length/Size ____________

￿90 deg. Elbows qty: ____

￿

45 deg. Elbows qty: ____

￿

Can condensate be trapped anywhere in the steam line? yes ￿ no ￿

CONDENSATE LINES

￿Sloped back to drain

￿Trap is greater than 2” duct static pressure

￿Size of trap_______

- 25 -

Page 29
Image 29
Nortec Industries GS Series Gs Inspection Check List, Humidifier Mounting, Gas Piping, Exhaust Gas Venting, Steam Lines