- 2 9 -
MANDATORY MAINTENANCE SCHEDULE
| 30 DAYS |
| END OF | WHAT NEEDS TO BE DONE? | ||
PARTS | after initial | MID |
|
| ||
SEASON | REGULAR MAINTENANCE | PREVENTIVE MAINTENANCE | ||||
|
| |||||
|
|
| ||||
|
|
|
|
|
| |
Hot Surface |
|
| X | - Check for continuity. |
| |
Ignitor |
|
|
| |||
|
|
|
| - Replace hot surface ignitor and flame | ||
|
|
|
|
| ||
|
|
| X | - Check that Flame Sensor is straight. | sensor with replacement kit. | |
Flame Sensor |
|
|
|
| ||
|
| - Clean sensor with fine steel wool. |
| |||
|
|
|
|
| ||
|
|
|
|
|
| |
|
|
|
| - Remove from the unit and clean with compressed |
| |
|
|
|
| air from outside matting. |
| |
Gas Burner |
|
| X |
|
| |
|
| NOTE: It is recommended to replace the burner |
| |||
|
|
|
|
| ||
|
|
|
| gasket each time a burner is removed. |
| |
|
|
|
|
|
| |
Drain Lines |
|
| X | - Switch to drain and make sure water flows freely. |
| |
|
|
|
|
|
| |
|
|
|
| - Adjust blow down time when required. Check that | - Drill out tank nipples when required to | |
Tank | X | X | X | scale has not accumulated above 2". | ensure nipples are not blocked with scale. | |
|
| |||||
|
|
|
|
|
| |
|
|
|
| - Clean tank when required. | - Clean tank. | |
|
|
|
|
|
| |
Float Chamber | X | X | X | - Ensure floats move freely. | - Clean scale from float chamber and hose | |
connecting to hit. | ||||||
|
|
|
|
| ||
|
|
|
|
|
| |
Fill Lines | X | X | X | - Inspect for leaks. |
| |
|
|
|
|
|
| |
Drain Lines | X | X | X | - Inspect for leaks at the drain pump, fill cup and |
| |
float chamber. |
| |||||
|
|
|
|
| ||
|
|
|
|
|
| |
|
|
|
| - Inspect for leaks. Ensure terminal cap is clear and |
| |
Gas Venting | X | X | X | any condensation produced flows to condensate |
| |
|
|
|
| traps. Flue temp should be between |
| |
|
|
|
|
|
| |
Direct Vent |
| X | X | - Inspect for leaks. Ensure intake terminal is clear. |
| |
|
|
|
|
|
| |
H/L Stack Sensor | X | X | X | - Visual check that sensor is intact, wired and |
| |
attached to the exhaust. |
| |||||
|
|
|
|
| ||
|
|
|
|
|
|