Provisioning Page137 of 544
Option11C and 11C Mini TechnicalReference Guide
Worksheet B: Total load
Customer:________________________________________
Date: ______________
Prepare one worksheet for each customer for cutover, 2-year, and 5-year
intervals, and one worksheet for the system for cutover, 2-year, and 5-year
intervals.
Line usage
Meridian Digital sets: TN________ x _______CCS/T=___________ CCS
500: TN____________ x _____________ CCS/T=___________ CCS
2500: TN____________ x _____________ CCS/T=___________ CCS
Total line load=___________ CCS
Trunk usage
Number of TNsCCS/T perTotal CCS load
Trunk routeaccessing routetrunk routeper trunk route
____________ ____________ x ____________ =____________CCS
____________ ____________ x ____________ =____________CCS
____________ ____________ x ____________ =____________CCS
____________ ____________ x ____________ =____________CCS
____________ ____________ x ____________ =____________CCS
____________ ____________ x ____________ =____________CCS
Total trunk load =____________CCS
Console usage
Number of consoles____________x 30 CCS
= Total console load =____________CCS
Digitone receivers
Number of DTRs (from tables)____________
= Total DTR load= ____________CCS
= Total load =____________CCS