Provisioning Page89 of 544
Option11C and 11C Mini TechnicalReference Guide
Worksheet H: Battery current and AC line calculation for ACsystems
using NTAK75 and N TAK76 .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153
Worksheet I: Battery current calculation for customer-provided DC
reserve power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154
List of tables•Table22: “Trunk traffic — Poisson 1 percent blocking” on page112
•Table23: “Trunk traffic — Poisson 2 percent blocking” on page114
•Table24: “Digitone receiver (DTR) requirements — Model 1” on
page117
•Table25; “Digitone receiver (DTR) requirements — Model 2” on
page118
•Table26: “Digitone receiver (DTR) requirements — Model 3” on
page119
•Table27: “Digitone receiver (DTR) requirements — Model 4” on
page120
•Table28: “Digitone receiver (DTR) load capacity — 6 to 15 sec ond
holding time” on page121
•Table29: “Digitone receiver (DTR) load capacity — 16 to 25 se cond
holding time” on page123
•Table30: “Digitone receiver (DTR) requirements — Poisson 0.1 percent
blocking” on page126
•Table33: “Conference and TDS loop requirements” on page 131
•Table34: “Digitone receiver provisioning” on page 132