Machine Maintenance Procedures 3-5

Machine Maintenance Procedures

Introduction 0
This chapter cont ains gen eral information ab out th e computer, a list of tools needed to do the
required main tenance and step by step pr ocedures on how to remo ve and inst all compon ent s
from the computer.
General Information 0
The product previews seen in the following procedures may not represent the final product
color or configuration. Cable paths and positioning may also diff er from the actual model.
During the removal and installation of components, make sure all availa ble cable channels
and clips are used and that the cables are installed in the same position.
All prerequisites must be comp leted prior to starting maintenance.
Recommended Equipment 0
The following equipment are recommended to do the following maintenance procedures:
Wrist grounding strap and conductive mat
Flat screwdr ive r
Philips screwdriver
Plastic tweezers
Flat plastic pry
Table 3-1. Screw List
Size Quantity Acer Part No.
M2.5*8.0 14 86.R4F02.002
M2.0*3.0 11 86.R4F02.004
M2.0D*3.0L 3.5D 4 86.R4F02.007
M2.5*6.0 Ni 2 86.R4F02.003
M2.5*5.0 21 86.R4F02.001
M3.0*3.0 Ni 4 86.R4F02.005
ICW50 CPU Thermal Screw 4 86.R4F02.008