Panasonic UB-5838C, UB-5338C Wall-Mounting Construction, Checking the Wall, Before Starting

Models: UB-5838C UB-5338C

1 56
Download 56 pages 24.34 Kb
Page 48
Image 48
Wall-Mounting Construction

Wall-Mounting Construction

Checking the Wall

When mounting on a wall, consult with your building’s owner, caretaker or construction manager to determine if the wall strength is sufficient to install this unit. For safety, install this unit only after thoroughly understanding the type of walls, the appropriate types of screws and the construction method (page 51).

Note

Do not attach the electronic board to mortared walls. Accidental electric leakage from the wall-mounting fixture screws to metal laths or wire laths can cause heat, smoke or fire.

1. Necessary Tools and Parts (not included with the product)

Drill, Screwdriver, Measuring tape, Level 8 screws (M6 size)

2.Before Starting

1.Make sure that the wall is strong enough to support the following weight. For UB-5838C: 1,373 N [140 kgf (309 lbf)]

For UB-5338C: 1,275 N [130 kgf (287 lbf)]

Note

If necessary, reinforce the wall so that it is strong enough to support the unit.

2.Make sure that the location is large enough to accommodate the unit.

For UB-5838C: 1,125 mm (H) 1,998 mm (W) [3' 8 19/64" (H) 6' 6 43/64" (W)]

For UB-5338C: 1,125 mm (H) 1,636 mm (W) [3' 8 19/64" (H) 5' 4 27/64" (W)]

3.Make sure that the AC outlet is within 3 m (9' 10 1/8" ) of where the unit will be mounted and that it will not be behind the unit.

48

Page 48
Image 48
Panasonic UB-5838C Wall-Mounting Construction, Checking the Wall, Necessary Tools and Parts not included with the product