Model 2616RC | 3 • Configuring the |
|
|
5.Under Dev Num B, select port1(1).
6.Under Dev Slots B, enter 1 - 32.
7.Under Dev Type B, select fromH110.
8.Under Dev Num B, select port1(1).
9.Under Dev Slots B, enter 32 - 62.
10.Click the Submit Query button. Card 2 mapping
1.Under Dev Type A, select
2.Under Dev Num A, select port10(10).
3.Under Dev Slots A, enter 1 - 32.
4.Under Dev Type B, select fromH110.
5.Under Dev Num B, select port1(1).
6.Under Dev Slots B, enter 1 - 32.
7.Under Dev Type B, select toH110.
8.Under Dev Num B, select port1(1).
9.Under Dev Slots B, enter 32 - 62.
10.Click the Submit Query button.
Configuring line settings and signaling for E1
Accessing the Line Interface Settings
1.On the 2616RC Configuration Menu, click the T1/E1 Link hyperlink to open the T1/E1 LINK ACTIV- ITY OVERVIEW page (see figure 35).
Figure 35. T1/E1 Link Activity Overview page
Using a browser to complete Model 2616RC configuration | 46 |