Philips V30 manual Safety test requirements, Hi-Pot Test Instruction, 107E5, Go to cover page

Models: V30

1 109
Download 109 pages 29.04 Kb
Page 86
Image 86

86

 

107E5

Go to cover page

Safety test requirements

All units that are returned for service or repair must pass the original manufactures safety tests. Safety testing requires both Hipot and Ground Continuity testing.

HI-POT TEST INSTRUCTION

1. Application requirements

1.1All mains operated products must pass the Hi-Pot test as described in this instruction.

1.2This test must be performed again after the covers have been refitted following the repair, inspection or modification of the product.

2. Test method

2.1 Connecting conditions

2.1.1The test specified must be applied between the parallel- blade plug of the mainscord and all accessible metal parts of the product.

2.1.2Before carrying out the test, reliable conductive connections must be ensured and thereafter be maintained throughout the test period.

2.1.3The mains switch(es) must be in the "ON" position.

2.2 Test Requirements

All products should be HiPot and Ground Continuity tested as follows:

3. Equipments and Connection

3.1.Equipments For example :

-ChenHwa 9032 PROGRAMMABLE AUTO SAFETY TESTER

-ChenHwa 510B Digital Grounding Continuity Tester

-ChenHwa 901 (AC Hi-pot test), 902 (AC, DC Hi-pot test) Withstanding Tester

3.2.Connection

* Turn on the power switch of monitor before Hipot and

Ground Continuity testing.

Clip

Clip

(ChenHwa 9032 tester)

Condition

HiPot Test for

HiPot Test for

 

products where

products where

 

the mains input

the mains input is

 

range is Full

110V AC(USA

 

range(or 220V

type)

 

AC)

 

 

 

 

Test

2820VDC

1700VDC

voltage

(2000VAC)

(1200VAC)

 

 

 

Test time

3 seconds

1 second

(min.)

 

 

 

 

 

Trip

set at 100 uA

5 mA

current

for Max.

 

(Tester)

limitation; set

 

 

at 0.1 uA for

 

 

Min. limitation

 

 

 

 

Ramp

set at 2

 

time

seconds

 

 

 

 

Ground Continuity Test requirement

Test current: 25A,AC

Test time:

3seconds(min.) Resistance

required: <=0.09+R ohm, R is the resistance of the mains cord.

Video cable

Connect the "video cable" or "grounding screw"

to the CLIP on your tester.

Grounding screw

Connect the power cord to the monitor.

2.2.1The test with AC voltage is only for production purpose, Service center shall use DC voltage.

2.2.2The minimum test duration for Quality Control Inspector must be 1 minute.No breakdown during the test.

2.2.3The test voltage must be maintained within the specified voltage + 5%.

2.2.4The grounding blade or pin of mains plug must be conducted with accessible metal parts.

Power outlet

(Rear view of monitor)

4. Recording

Hipot and Ground Continuity testing records have to be kept for a period of 10 years.

Page 86
Image 86
Philips V30 manual Safety test requirements, Hi-Pot Test Instruction, 107E5, Go to cover page