9 • Maintaining and Updating

12. Replace the E-Z Seal®

 

Sealing Solution bottle.

 

Gently tap the top of the

 

solution bottle.Wait for

 

about 5 minutes and

 

then check to make sure

 

the moistener tank is

 

filled with the correct

 

amount of E-Z Seal®

 

solution. Measure the

 

amount of solution as

 

shown in the diagram on

 

the right.

 

The solution level

 

should be:

 

14-18mm(0.55-0.71 in.)

 

If after another 5 min-

 

utes the level is still not

 

correct, go to step 13.

 

Otherwise go to step 14.

Solution level

13.Remove the moistener tank and hold it as high as you can above the machine as shown in the picture on the right.

Hold it in this position for approximately 20 seconds.

a.Replace the moistener tank again and gently slide it back into the machine, taking care not to crimp the supply tubing. Do not push the tank all the way back into the machine yet.

b.Wait about 5 minutes and then check the level of E-Z Seal® Sealing solution again as described in step 12.

9 - 10

SV61436 Rev. D

Page 146
Image 146
Pitney Bowes DM550, DM500 manual 14-18mm0.55-0.71