UPS Operation
Use the following procedure to reinstall the PPU and transfer the critical load from Maintenance Bypass (AC Line operation) to the PPU:
1.Reconnect the battery cabinet to the battery connector on the PPU rear panel.
2.Switch the circuit breaker on all battery cabinets to the ON ( ) position.
3.Confirm the correct UPS output voltage is selected according to the PPDM model:
PPDM Model Number | UPS Voltage Selector Switch Position* |
|
208: 120/208 Hardwired | Set to 208V for 120/208V PPDM output | |
| Set to 220V for 127/220V PPDM output | |
|
|
|
208: 120 | 208 |
|
|
|
|
208: 120/208 | 208 |
|
|
|
|
208: 120/208 | 208 |
|
|
|
|
208: 120/240 | 208 |
|
|
|
|
240:120/240 Hardwired
240:120/240
| Set to 200V for 100/200V PPDM output | |
240: 120/240 | ||
Set to 220V for 110/220V PPDM output | ||
| ||
240: 120/240 | Set to 230V for 115/230V PPDM output | |
| Set to 240V for 120/240V PPDM output | |
|
240:120/240
240:120/240E Hardwired
*The UPS output voltage should match local voltages.
Using a screwdriver, turn the switch to the corresponding position of the output voltage required (see Figure 25). The output voltage is
C A U T I O N
Do not turn the Voltage Selector switch while the UPS is operating (see “Changing the Output Voltage” on page 53). Changing the output voltage while the UPS is operating may cause an emergency
56 | Powerware® 9 Prestige Series User’s Guide (4500/6000 VA) S Rev H www.powerware.com |