PARALLEL INSTALLATION

7.Punch holes for the conduit (AC input, each UPS output, and load connection) using a Greenlee® punch or similar device.

8.Verify that the parallel bypass breaker is in the OFF position (see Figure 8).

9.Mount the parallel tie cabinet to the wall and install the conduit.

Figure 8. Parallel Bypass Breaker

16

EATON Powerware® 9155 Parallel UPS (8–15 kVA) User’s Guide S 164201592 Rev C www.powerware.com