PARALLEL INSTALLATION

16.Wire the AC input to the bypass breaker (see Figure 13).

Neutral

Line 2

Line 1

Figure 13. Parallel AC Input Wiring

17.Verify the phase rotation for each UPS and the bypass input.

18.Reinstall the internal cover removed in Step 6.

19.Reinstall the parallel tie cabinet front cover removed in Step 5.

20.Continue to “Installing Options” on page 23.

EATON Powerware® 9155 Parallel UPS (8–15 kVA) User’s Guide S 164201592 Rev C www.powerware.com

21