Installation Setup

Stabilizer Bracket

Figure 8. Stabilizer Bracket Installation

Rack-Mount Installation

The 3- and 6-slot UPS cabinets may be installed in an EIA-standard 19￿ (48.3-cm) equipment rack. An optional rack-mounting kit (ASY-0547), containing brackets and required hardware, is available for such an installation. For each 3-slot section, use the following mounting procedure to convert the UPS cabinet and install it in the equipment rack:

NOTE The UPS cabinet is heavy. This procedure requires two people to lift and position the cabinet into the equipment rack. Install the cabinet in the rack before installing power and battery modules, and before plugging the UPS into the intended power outlet.

1.Remove the four screws (two on either side) securing the top cover of the UPS cabinet. Carefully lift the cover straight up and off, to avoid stressing the front panel display. Set the cover aside.

2.Remove the two cabinet side panels (4 panels in 6-slot cabinets) by lifting the top edge. No other hardware must be detached. Store or discard the side panels.

3.Carefully replace the UPS cabinet top cover and secure with the four screws removed in Step 1. Position the cover lip to fit behind the front display panel.

4.Install three metal clip-nuts onto each side flange (6 clip-nuts on 6-slot cabinets) along the front of the UPS cabinet (see Figure 9).