Battery Cabinet Installation

Cable Assembly

Figure 16. Battery Cable Assembly Installation

12.Align the screw holes of the cable assembly's entry plate with holes on the cabinet side panel as shown in Figure 16. Secure the entry plate with screws supplied with the cable assembly.

13.If the battery cable will be installed in customer-supplied flexible or other conduit (as required by local wiring codes), loosen the two screws holding the strain-relief clamp shown in Figure 16. Remove the clamp by loosening the star nut on the inside of the entry plate, leaving the nut in place. Replace the clamp with a panel-to-conduit feedthrough and secure it with the star nut.

14.Secure the cable assembly terminals by tightening the nuts onto the backplane bus bars. Also tighten the third nut, holding the other fuse end. Torque all three nuts to 75￿85 in lb

(8.5￿9.6 Nm).

15.Replace the UPS cabinet rear panel with the screws removed in Step 2 on page 17.

16.If the battery cable will be installed in flexible or other conduit, pull the conductors through the conduit. Attach the conduit to both the UPS power entrance panel and the battery cabinet entrance panel as shown in Figure 17.

20

Powerware® 9170 User's Guide ￿ LTM-1344 B Uncontrolled Copy