Electrical Installation

System Wiring Diagrams

The following notes are referenced in the non-isolated system wiring diagrams (Figure 28 through Figure 33). To determine which diagram is correct for your site, see Table 5 on page 35.

NOTE 1 The customer must provide input overcurrent protection as stated in NEC Section 240-21 or local codes. Size the protection device according to local code requirements (see Table 1 on page 26).

NOTE 2 The UPS bypass switch must be installed within sight of the UPS. To properly install, complete the voltage and phase check procedure in •Startup for Hardwired Units" on page 53. The wires coming from the side of the switch must be connected as described in Step 10 on page 33.

NOTE 3 All AC circuit conductors, including the neutral and equipment grounding conductors, must be the same size (ampacity), have the same rating (75°C) copper wire, and be sized according to the input circuit breaker. The UPS input and output conductors must be run through separate conduits.

NOTE 4 The customer must provide output overcurrent protection. See NEC Section 240-21 or local requirements. See Table 13 on page 78 for maximum output overcurrent protection device ratings.

NOTE 5 See •Equipment Clearances" on page 7 for installation and service clearances before installing the UPS. Use flexible conduit on the UPS or the external battery cabinet if either must be moved.

NOTE 6 External UPS battery cabinets are optional. See •Battery Cabinet Installation" on page 17 for installation instructions.

NOTE 7 UPS output circuits shall be installed in dedicated conduit systems and not shared with other electrical circuits.