2700-I ACC Wood Insert

Surround & Trim Kit Installation (Cont’d)

R

6.Align the 2 screws in the top surround piece to the 2 align- ment holes on the appliance top. Figure 42.2.

7.Align the surround slots to the lower pins on the appli- ance, one on each side. Figure 42.3

Alignment Screw

in Surround Top

Alignment Hole

in Appliance Top

Figure 42.2

Alignment

Pin on

Appliance

Surround

Star-Up AirAlignment

ControlSlot

Figure 42.1

G. Top Installation Instructions

NOTE: The top is packaged separately and shipped with the appliance. Install after the appliance is in place and the installation of the surround and trim are complete.

1.Push the top into place by aligning the pins into the slots. Figure 42.4.

2.Press down into position.

Figure 42.3

Surround Top

Top

Figure 42.4

Page 42

7046-137C

December 15, 2009

Page 42
Image 42
Quadra-Fire 7046-137C warranty ACC Wood Insert Surround & Trim Kit Installation Cont’d, Top Installation Instructions