Quadra-Fire CB1200MI-MBK, CB1200I CB1200-IPellet Insert, Rear Vent Installation Preparation

Models: CB1200MI-MBK CB1200I

1 52
Download 52 pages 35.16 Kb
Page 19
Image 19
Rear Vent Installation Preparation:

R

CB1200-I Pellet Insert

Rear Vent Installation Preparation:

1.Remove the ENTIRE exhaust blower housing by remov- ing the 4 nuts using a 7/16 inch socket wrench. Set the nuts aside for later use.

2.Remove the 4 screws and remove the vertical exhaust transition pipe exhaust blower housing.

4.Assemble the right corner and right panel pieces using 4 screws prior to attaching to insert. Figure 19.4.

5.After assembly, attach the right shroud panel/corner piece assembly to the insert with 3 screws across the bottom and 1 on the side. Figure 19.4.

3.Remove any silicone sealant remaining on the blower housing.

4.Attach the rear vent adapter to the exhaust blower hous- ing with 4 screws. Figure 19.2.

5.Apply a bead of high temperature silicone adhesive around the juncture of the blower housing and rear vent adapter, smoothing it around the joint to ensure that a good seal is made.

6.Re-install the exhaust blower housing (now with rear vent adapter attached) with the 4 nuts previously removed in Step 1.

7.Use 2 screws to attach left corner filler piece of rear shroud to the insert hopper. Figures 18.1 & 18.2 on page 18.

8.Install the left shroud corner with 2 screws into the hopper body and 1 down into filler piece. Figure 19.1.

9.Install cover plate over top vent opening using 4 screws.

Left Corner

Piece

Figure 19.1

Figure 19.2

 

Installing Rear Shroud

Top Vent Applications: Leave knock-out plate in place.

Figure 19.3

 

Knock-Out

 

Plate

Outside Air

 

Cover Plate

 

Left Side

Figure 19.3

 

Right Corner Piece

Attach right

 

corner piece to

 

side panel first.

Rear Panel

Right Side

 

Figure 19.4

Attaching Shroud to Hopper Body:

6.Beginning at the right shroud panel drill into hopper body through the 3 pre-drilled openings and the 2 pre-drilled openings on the rear shroud panel. Figure 19.5. Continue around to left shroud corner panel at the 2 pre-drilled openings. Figure 19.6. Secure with screws to insert.

7.For Top Vent Installation:

Install 3 inch or 4 inch (76 or 102mm) top vent adapter. See circled area in Figure 18.3 on page 18. NOTE: This adapter may be attached to outside venting prior to latching it on to the top vent pipe.

Drill Holes

Drill Holes

Rear Panel

Rear Vent Applications: Clip corners of knock-out plate,

 

 

 

 

 

Figure 19.5

 

remove and discard, prior to assembling rear shroud kit.

 

 

 

 

 

 

 

 

 

 

1. Install rear panel using 4 screws along bottom and 2 screws

 

 

 

 

 

into the left shroud corner piece at the top. Figure 19.3.

 

 

 

Drill Holes

 

 

 

 

 

 

2.If your installation does not include an outside air kit, attach cover plate with 4 screws.

3.Attach left shroud panel using seven screws, 3 on top and

bottom and 1 along the side. Figure 19.3.

 

Figure 19.6

 

 

 

 

 

 

 

 

 

 

 

February 3, 2010

7014-188B

 

Page 19

Page 19
Image 19
Quadra-Fire CB1200MI-MBK, CB1200I CB1200-IPellet Insert, Rear Vent Installation Preparation, Installing Rear Shroud