
CB1200-I Pellet Insert
7Appliance Set-Up
R
A.Rear Shroud Installation
1.Top Vent Installations
Parts Required:
Part
Includes: Six galvanized steel shroud pieces, two cover plates and fastener package.
Part
Includes: Vent pipe and two 1/4 - 20 x 3/4 inch bolts with nuts.
Part
2.Rear vent installations Parts Required:
Part
|
|
|
|
| REAR SHROUD TOP | ||
|
|
|
| VENT PART | |||
|
|
|
|
|
| Right Corner | |
Top Vent Opening | |||||||
Left Corner |
|
|
|
|
|
| |
| Left | Corner | |||||
|
| Piece | |||||
| Filler | ||||||
|
|
| |||||
Rear | |||||||
Knock | Access | ||||||
Vent | |||||||
|
|
|
|
|
| ||
Outside | Air | Vent | |||||
| |||||||
|
|
|
| ||||
Pipe | Access | ||||||
|
|
|
|
|
Includes: Rear Vent Adapter and fastener package.
Tools Required:
Figure 18.1
Electric drill, 1/8 inch drill bit, Phillips screw driver, 3/8 inch wrench & 7/16 inch wrench, (7/16 inch socket wrench & high temperature silicone adhesive are also required for rear vent installations).
Complete the following procedures, based on your venting installation, prior to installing the rear shroud kit. (Note: All photos depict top vent installation).
Top Vent Installation Preparation
Filler Piece
Figure 18.2
Rear Shroud
Top Vent
Figure 18.3
1.Remove the top vent adapter from the vertical exhaust transition pipe. Figures 18.2 and 18.5.
2.Use 2 screws to attach left corner filler piece of rear shroud to the insert hopper. Figures 18.1 and 18.2.
3.Use (2) 1/4 - 20 x 3/4 inch bolts with nuts to install rear shroud top vent to the exhaust transition. See boxed area in Figure 18.3. (Circled area, top vent adapter, will be installed later).
4.Install the left shroud panel corner at 3 points, 2 screws into back of hopper and 1 down into the filler piece).
Figure 18.4
Left Corner |
Piece |
Figure 18.4
Vertical Exhaust |
Transition Pipe |
Top Vent Adapter |
Figure 18.5
Page 18 | February 3, 2010 |