Safety Alert Key:
•DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.
•WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.
•CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
•NOTICE: Used to address practices not related to personal injury.
Table of Contents
A. | Congratulations | 2 |
B. | Limited Lifetime Warranty | 5 |
1 Listing and Code Approvals
A. | Appliance Certi cation | 7 |
B. | Ceramic Glass Speci cations | 7 |
C. | BTU Speci cations | 7 |
D. | High Altitude Installations | 7 |
E. | 7 | |
F. | Combustible Materials Speci cation | 7 |
G. | Electrical Codes | 7 |
H. | Requirements for |
|
| the Commonwealth of Massachusetts | 8 |
User Guide
2 Operating Instructions
A. | Gas Fireplace Safety | 9 |
B. | Your Fireplace | 9 |
C. | Clear Space | 10 |
D. | Decorative Doors and Fronts | 10 |
E. | Fixed Glass Assembly | 10 |
F. | Dashboard Control | 10 |
G. | Remote Operation | 11 |
H. | Before Lighting Fireplace | 16 |
J. | Lighting Instructions (IPI) | 17 |
K. | After Fireplace is Lit | 18 |
L. | Frequently Asked Questions | 18 |
3 Maintenance and Service |
| |
A. | Maintenance | 19 |
B. | Maintenance | 20 |
Installer Guide
4 Getting Started |
| |
A. | Typical Appliance System | 22 |
B. | Design and Installation Considerations | 23 |
C. Tools and Supplies Needed | 23 | |
D. Inspect Appliance and Components | 23 |
5 Framing and Clearances |
| |
A. | Select Appliance Location | 24 |
B. | Construct the Appliance Chase | 25 |
C. | Clearances | 25 |
D. | Mantel and Wall Projections | 26 |
6 Termination Locations
A. Vent Termination Minimum Clearances | 27 |
7 Vent Information and Diagrams
A. | Approved Pipe | 29 |
B. | Vent Table Key | 29 |
C. | Use of Elbows | 29 |
D. | Measuring Standards | 29 |
E. | Vent Diagrams | 30 |
8 Vent Clearances and Framing
A. | Pipe Clearances to Combustibles | 34 |
B. | Wall Penetration Framing | 34 |
C. | Install the Ceiling Firestop | 35 |
D. | Install Attic Insulation Shield | 36 |
9 Appliance Preparation
A. Secure and Level the Appliance | 37 |
10 Install Vent Pipe
A. | Assemble Vent Sections | 38 |
B. | Assemble Slip Sections | 39 |
C. | Secure the Vent Sections | 40 |
D. | Disassemble Vent Sections | 40 |
E. | Install Metal Roof Flashing | 41 |
F. | Assemble and Install Storm Collar | 42 |
G. | Install | 43 |
H. | Install Vertical Termination Cap | 44 |
I. | Heat Shield Requirements for |
|
| Horizontal Termination | 44 |
J. | Install Horizontal Termination Cap | 45 |
11 Gas Information
A. | Fuel Conversion | 46 |
B. | Gas Pressure | 48 |
C. | Gas Connection | 48 |
D. | High Altitude Installations | 48 |
12 Electrical Information
A. | Wiring Requirements | 49 |
B. Standing Pilot Ignition System Wiring | 49 | |
C. | Optional Accessories Requirements | 49 |
D. Electrical Service and Repair | 50 | |
E. | Junction Box Installation | 51 |
13 Finishing
A. | Mantel and Wall Projections | 52 |
B. | Facing Material | 53 |
C. | Facing Template Removal | 53 |
D. | Mantel | 53 |
3 |