E. Install Metal Roof Flashing
Note: Skip to Section 10.I. if using the
•See minimum vent heights for various pitched roofs (Figure 10.11) to determine the length of pipe to extend through the roof.
•Slide the roof ashing over the pipe sections extending through the roof as shown in Figure 10.12.
NOTICE: Failure to properly caulk the roof ashing could cause water entry.
• | Caulk the gap between the roof ashing and the outside |
| diameter of the pipe. |
• | Caulk the perimeter of the ashing where it contacts the |
| roof surface. See Figure 10.15. |
24 in. min.
(610 mm)
Termination
Cap
Storm Collar
20 in. (508 mm)
Lowest
Discharge
Opening
12
Horizontal overhang
Vertical wall
X
Pipe
Caulk
Roof Flashing
Roof Pitch is X / 12
H (min.) - Minimum height from roof to lowest discharge opening.
Flashing
Figure 10.12 Caulking
Roof Pitch | H (Min.) Ft. | Roof Pitch | H (Min.) Ft. | ||
Flat to 6/12 |
| 1.0* | Over 11/12 to 12/12 | 4.0 | |
Over 6/12 to 7/12 | 1.25* | Over 12/12 to 14/12 | 5.0 | ||
Over 7/12 to 8/12 | 1.5* | Over 14/12 to 16/12 | 6.0 | ||
Over 8/12 to 9/12 | 2.0* | Over 16/12 to 18/12 | 7.0 | ||
Over 9/12 to 10/12 | 2.5 | Over 18/12 to 20/12 | 7.5 | ||
Over 10/12 to 11/12 | 3.25 | Over 20/12 to 21/12 | 8.0 | ||
| * 3 ft. minimum in snow regions |
|
|
Figure 10.11 Minimum Height From Roof To Lowest Discharge Opening
41 |