G. Install RF4-8
The
Pipe must be supported within 12 in. (305 mm) of the roo ine using plumbers strapping when using the
•Trim the rubber boot (using scissors or a utility knife), cutting along the marked measurement lines. See Figure
10.15.Use the 210 mm line for DVP pipe.
•Lubricate pipe or ue with water and slide the ashing down. It may be necessary to trim the top shingles around the base of the rubber boot to ensure a good t.
•Draw around ashing, remove ashing.
•Apply silicone sealant to roof inside the lines (Figure 10.15)
•Lubricate pipe or ue with water and slide ashing down. Seat rmly in sealant. Nail roof ashing to the roof.
•Apply silicone sealant on the top and side edges of the ashing. See Figure 10.17. Install shingles,Apply sealant
at the top edge of the rubber boot. See Figure 10.18.
•We recommend that you top coat with conventional acrylic house paint to improve the appearance of your galvanized base ashing.
Figure 10.15 Trim Rubber Boot
The
Figure 10.16 Apply Sealant
Apply Sealant
Top & Partial Sides
Figure 10.17 Slide Flashing Down, Secure & Apply Sealant
Silicone Sealant (top of boot) ![Apply Sealant](/images/new-backgrounds/53537/5353785xi2.webp)
Shingles Trimmed
Flashing over | Shingles over | |
Shingles | ||
Flashing | ||
|
Figure 10.18 Installation Complete