The flex vent must be supported with the spacing between support intervals not exceeding 4 feet, with no more than ½ inch sag between supports.
A support is required at each change in venting direction, and in any location where it is necessary to maintain the necessary clearance to combustibles. A simple “up and out” installation (Figure 9) requires only enough support to main- tain the necessary clearance to combustibles. However, the vent attachment point and the firestop location are consid- ered to be supports.
STRAIGHT UP
VERTICAL VENTING
V (FT.)
45' MAX. (13.7m)
NOTE: For vertical venting over 20 feet a restrictor plate is recommended for improved
3” CLEARANCE
TERMINATION
CAP
1”
CLEARANCE
flame appearance.
Use SL D-Series components only.
Figure 9.
STRAIGHT OUT HORIZONTAL VENTING
H
Max. Run
36" (914 mm)
Note: Use two 90o elbows for corner installations.
Use D-Series components only.
Figure 10. Straight up Vertical Venting
H
Note: There MUST be a 25% reduction in total H when using flex vent, except when using the simple up and out installation (see Figure 9).
Figure 11. Straight Out Horizontal Venting