Quadra-Fire QV32-A Ceiling Firestop Ceiling Side, Hole & New Framing Members, Attic Firestop

Models: QV32-A QV36-A

1 42
Download 42 pages 34.68 Kb
Page 28
Image 28
 JOIST

For Vertical Runs - One ceiling firestop is REQUIRED at the hole in each ceiling through which the vent passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the verti- cal vent component.

Mark the ceiling to establish the centerpoint of the vent.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wir- ing or plumbing runs.

Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut an 11-inch X 11-inch (280mm X 280mm) for D-Series or a 10-inch X 10-inch (254mm X 254mm) hole through the ceiling, using the centerpoint previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

Figure 28. Ceiling Firestop (Ceiling Side) JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 28. Ceiling Firestop (Ceiling Side)

11" (280 mm) or 10" (254 mm)

NEW

FRAMING

MEMBERS

CEILING

11" (280mm) or 10" (254mm)

CHIMNEY

HOLE

EXISTING CEILING JOISTSFigure 27. Hole & New Framing MembersFigure 29. Attic Firestop

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).

NOTE: There must be NO INSULATION or other combus- tibles inside the framed firestop opening.

NAILS (4 REQUIRED)

Figure 27. Hole & New Framing Members

RAFTER

CEILING

CEILING FIRESTOP

Figure 29. Attic Firestop

28

Page 28
Image 28
Quadra-Fire QV32-A, QV36-A manual Ceiling Firestop Ceiling Side, Hole & New Framing Members, Attic Firestop