C. Vent Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal vent:

Rotate and interlock the ends as described at the begin- ning of the Installing Vent Components section.

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior position on the building.

WARNING: THE TERMINATION CAP MUST BE

!POSITIONED SO THAT THE ARROW IS POINTING UP.

For roundcap termination kits:

Use the exterior pipelock hole on the round flange of the wall firestop to secure the vent pipe in place.

For trapezoidal cap termination kits:

Using screws secure the cap to the exterior wall through the flanges in the cap.

!WARNING: THE BOTTOM OF THE VENT TERMINATION CAP MUST BE A MINIMUM

OF 12 INCHES (305 MM) ABOVE GROUND LEVEL (GRADE). THE TOP OF THE CAP MUST BE A MIN- IMUM OF 18 INCHES (457 MM) BELOW COMBUS-

TIBLE MATERIAL, SUCH AS A DECK. THE SIDE OF THE CAP MUST BE A MINIMUM OF 6 INCHES (152 MM) AWAY FROM A PARALLEL OUTSIDE WALL. VENTING TERMINALS SHALL NOT BE RE- CESSED INTO A WALL OR SIDING. SEE THE DIA- GRAM FOR VENT TERMINATION CLEARANCES.

ROUND CAP TERMINATION

PERFORATION CANNOT BE

INSIDE THE WALL

71/2"

(191mm)

MINIMUM

TRAPEZOID CAP TERMINATION

7 1/4" (184mm)

Figure 30. Round & Trapezoid Termination Caps