SECTION 11: COMMISSIONING

SECTION 11: COMMISSIONING

Gas Fired Heater

Installation, service, commissioning and annual inspection of the heater must be done by a contractor qualified in the installation and service of gas-fired heating equipment. Read this manual carefully before installation, commissioning, operation, or service of this equipment. All components are accessed via the hinged door. Opening the door exposes live electrical connections and hot components.

Cooling Coils/Condensers

Installation, service, commissioning and annual inspection of the cooling equipment must be done by a contractor qualified in the installation and service of refrigeration equipment. Read condenser manufacturers manual carefully before installation, commissioning, operation, or service of this equipment.

WARNING

Electrical Shock Hazard

Use extreme caution while commissioning.

Failure to follow these instructions can result in death or electrical shock.

11.1 Pre Commission Checks

All pre commission checks must be carried out before lighting the heater.

Ensure that the heater and all controls are suitable for the gas, pressure and electrical supply to which they are to be connected.

11.1.1 Louvers

Where fitted, the air delivery louvers need to be set during commissioning to give the required air distribution.

WARNING

11.1.2 Electrical Checks

1.Check that all site wiring is connected in accordance with the appropriate wiring dia- grams on Page 17, Section 10.3 through Page 20, Section 10.6.

2.Check the correct fuse size is fitted; See Page 16, Section 10.1.

11.2 Gas Supply

All aspects of the gas installation including the gas meter must be inspected, tested for soundness and purged in accordance with local and national codes.

11.3 Mechanical Checks

1.Check that the fan is free to run and that the fan rotates in the correct direction. To reverse rota- tion transpose two of the incoming phase con- nections.

2.Check that the flue and air intake are installed in accordance with these instructions and local regulations.

3.Check that the settings of the Combination Fan/

Limit thermostat are correct - See Page 7, Sec- tion 4.3 and Page 8, Figure 4.4.

NOTE: The second limit thermostat is preset and sealed at the factory and is not adjustable.

11.4 Begin Commissioning

11.4.1 Before Operating the Heater

To ensure that all the controls are in safe working order, operate the heater for the first time with the isolating gas valve turned off.

1.Turn off the isolating gas valve

2.Using the installed external control, turn on the burner. The automatic sequence will now begin

as described on Page 22, Figure 12.

There will be no ignition of the burner and lockout will occur, proving the controls are operating correctly.

Cut Hazard

Turn off gas and electrical supply before maintenance. Fan can start automatically at any time.

Failure to follow these instructions can result in severe injury or product damage.