Attach this information to the wall near the ROBERTS GORDON® heater
®
Read the installation, Commissioning, Operation and Service Manual thoroughly before installation, operation or service.
OPERATING INSTRUCTIONS | WARNING | |
| ||
|
| |
|
|
1.STOP! Read all safety instructions on this information sheet.
2.Open the manual gas valve in the heater supply line.
3.Turn on electric power to the heater.
4.Set the thermostat to desired setting (above ambient temperature).
The automatic starting sequence begins.
NOTE: Following long shutdown periods, the burner control may go to to 'LOCKOUT' during the start sequence. Push the reset button to recommence firing. Contact service department if 'LOCKOUT' continues (see manual for details).
TO TURN OFF THE HEATER
|
| Fire Hazard | |
1. | Turn the thermostat/time switch to 'OFF'. The burner will turn 'OFF' | ||
| |||
immediately, but fans will continue to cool heat exchanger until the fan | Some objects can catch fire or explode when placed | ||
thermostat switches off. | |||
|
| close to heater. | |
IF THE HEATER WILL NOT OPERATE, TO ENSURE YOUR SAFETY, | |||
| |||
FOLLOW THESE INSTRUCTIONS TO SHUT DOWN YOUR HEATER | Keep all flammable objects, liquids and vapors the | ||
|
| required clearances to combustibles away from heater. | |
1. | Set the thermostat to off or the lowest setting. | ||
| |||
2. | Turn off electric power to the heater. | Failure to follow these instructions can result in death, | |
3. Turn off the manual gas valve in the heater supply line. | injury or property damage. | ||
4. | Call your registered installer/contractor qualified in the installation | ||
| |||
| and service of |
|
Installation Clearances | Roof Terminal |
|
| Alternative | |
Air | Flue | Wall | |
Intake | Terminal | ||
| |||
15 cm |
|
| |
|
| Air Flow | |
|
| Condense Drain | |
|
| Install to | |
|
| suitable drain | |
|
| 60 cm | |
3 m |
|
| |
| Insulated |
| |
2.5 - 3.5 m* | Refrigerant pipes |
| |
to cooling coil | Customers | ||
| by Customer | ||
| Suitable | ||
|
| Condenser | |
|
| Unit |
Clearances to Combustibles
| 15 cm |
50 cm | 50 cm** |
| 30 cm |
**80 cm is necessary to service heater.
Telephone: 716.852.4400 |
| Service Telephone: +44(0) 1902 498733 | |
1250 William Street | Fax: 716.852.0854 | Oxford Street | Service Fax: +44(0) 1902 401464 |
P.O. Box 44 | Toll Free: 800.828.7450 | Bilston, West Midlands WV14 7EG UK | |
Buffalo, NY |
| Telephone: +44(0) 1902 494425 | |
| Fax: +44(0) 1902 403200 |
| |
|
|
|
Installation Code and Annual Inspections: All installations of ROBERTS GORDON® products must be performed by a contractor qualified in the installation and service of
For optimum performance and safety,
©2005 ROBERTS GORDON® All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of
Printed in the U.S.A. |