Stepwise startup
1
KAP02.FM5
14.8.98 Gigaset 2010, UEB/engl.: A30852-X1100-E301-3-7619
Stepwise startupFollow the installation and setup instructions “step by
step” as described.
Step 1: Observe the safety precautions
Step 2: Check the contents of the package
The factory package contains:
●a Gigaset 2010 base station,
●a Gigaset 2000S handset,
●a phone cord,
●a power cord with RJ-11 plug and plug-in power
supply,
●cover for handset battery compartment,
●carrying clip for the handset,
●two batteries,
●instructions.
Before you can operate with your handset you
have to connect the base station Gigaset 2010.
It is essential that you read the safety pre-
cautions at the begining of this manual before
startup!