SMC Networks VDSL2 manual Equipment Checklist, Package Contents

Models: VDSL2

1 96
Download 96 pages 6.18 Kb
Page 42
Image 42

INSTALLING THE SWITCH

Protection from radio frequency interference emissions

Electrical surge suppression

Separation of electrical wires (switch related or other) and electromagnetic fields from data based network wiring

Safe connections with no damaged cables, connectors or shields

RJ-45 Connector

Figure 3-3 RJ-45 Connections

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the components. If any of the items are missing or damaged, contact your local distributor. Also, be sure you have all the necessary tools and cabling before installing the switch.

Package Contents

TigerAccess EE Switch (SMC7816M/VSW)

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and four screws for attaching the brackets to the switch

Power cord—either US, Continental Europe or UK

Two RJ-21 cables

This Installation Guide

Management Guide CD

3-4

Page 42
Image 42
SMC Networks VDSL2 manual Equipment Checklist, Package Contents