Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

The mechanical design of the GH Hopper is very simple and very little maintenance is required. The only moving parts are the metering gates, weigh hopper dump valve, and mixer agitator. The checklist below contains a list of items which should be inspected and/or replaced to keep your GH Hopper operating at peak efficiency. Perform each inspection at the regular intervals listed below.

Figure 52: Sample Preventative Maintenance Schedule

System model #

 

 

 

 

 

 

Serial #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Daily

Date/

Date/

Date/

Date/

 

Date/

 

Date/

Date/

Date/

Date/

 

Date/

Date/

Date/

Date/

By

By

By

By

 

By

 

By

By

By

By

 

By

By

By

By

Inspect hopper for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

any loose parts-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tighten them

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

immediately.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify quality of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

compressed air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

supply.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect weigh

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

hopper for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

obstructions.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every week

Date/

Date/

Date/

Date/

 

Date/

 

Date/

Date/

Date/

Date/

 

Date/

Date/

Date/

Date/

By

By

By

By

 

By

 

By

By

By

By

 

By

By

By

By

Verify the rate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

monitor is properly

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

calibrated.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check to make

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sure that all hose

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

connections are air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tight.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every month

Jan

Feb

Mar

Apr

May Jun Jul Aug

Sep

Oct

Nov

Dec

Inspect air regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and air safety

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

circuits, if equipped.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recalibrate rate monitor If necessary.

Photocopy this page for your maintenance records

Chapter 5: Maintenance

42 of 60

Page 42
Image 42
Sterling 882.00722.00 manual Preventative Maintenance Schedule